Frame Stage Inspection — What Your Independent Inspector Checks Before Plaster

Quick answer: A frame stage inspection happens after the timber wall and roof framing is up and the bracing is on, but before plasterboard goes on. It’s your last chance to catch structural defects before they’re hidden inside walls. An independent VBA-registered inspector checks tie-downs, brackets, lintels, bracing, and conformance with engineering plans — typically […]